9/30/2014 - 9:53 AM EST - Aureus Mining Inc. : announced results from the remaining 49 holes of the phase four drilling programme at the Ndablama gold project. Drilling was undertaken to test the down dip and strike extensions to the 2013 Inferred Mineral Resource of 451,000 ounces at 2.1 g/t Au, released on the 11 November 2013. Intercepts include: 3.0 g/t over 28 metres from 139 metres; 3.0 g/t over 22 metres from 98 metres. Aureus Mining Inc.
shares T.AUE are trading up $0.025 at $0.39.