2/26/2015 - 3:45 PM EST - Forum Uranium Corp. : announced that a 3,000-metre drill program has commenced on Forum's 100% owned Fir Island project located along the north rim of the eastern Athabasca Basin. This project is strategically located on the Centennial - Black Lake Structural Corridor that transects the entire basin, and has road access to the nearby AREVA McClean Lake Mill and the Cameco Rabbit Lake Mill. Cameco's Centennial deposit lies at the south end of the corridor, and the historic Nisto mine (106 tonnes mined at 1.63% U3O8) lies within 200 metres of the Forum claim boundary. Forum Uranium Corp.
shares V.FDC are trading unchanged at $0.09.