Baystreet Staff -

Emerald Bay Begins Drilling Operations at Kuhn 4

[ACCESSWIRE]

CALGARY, AB / ACCESSWIRE / October 5, 2017 / Emerald Bay Energy Inc. (TSX-V: EBY; OTC PINK: EMBYF) (the "Company" or "Emerald Bay") is pleased to announce that drilling operations have commenced on the Kuhn 4 well at the Company's Wooden Horse play in South Texas. Using the Company's seismic data, as well as well control from recent drilling activity in the area, including the recently drilled Kuhn 3 well, the Company will offset the previously producing Kuhn 1C well. The Company will drill the well to the upper Edwards formation and it is anticipated that the possible productive zones include the Austin Chalk, Buda, Georgetown, and Edwards formations. Drilling to total depth will take approximately 5 days, at which point the Company will assess the commercial viability of the well.

"We are very pleased with recent developments at Wooden Horse. Using the 3D seismic program that we have continued to refine over the past year, along with additional well control that we now have from recent drilling activity in the area, we have never been more confident about the potential at Wooden Horse. A lot of work and a lot of expertise has gone into selecting the location for this well and we feel that Kuhn 4 may be the start of exciting things to come at Wooden Horse," stated Shelby Beattie, CEO of Emerald Bay.

As per our new release dated June 28th, 2017, this will be our first well being drilled under the new working interest of 50% to Emerald Bay Energy.

About Emerald Bay

Emerald Bay Energy Inc. (EBY) is an energy company with oil producing properties in southwest Texas as well as non operated oil, natural gas, and electricity generation interests in Central Alberta, Canada. EBY is the operator of the Wooden Horse and Nash Creek Projects in Guadeloupe, Texas, where the Company currently now owns a 50.00% working interest in those projects. The Company also owns 75% of Production Resources Inc., a South Texas oil company.

To stay informed on Emerald Bay Energy, please join our Investor Group at www.8020connect.com for all upcoming news releases, articles, comments, and questions.

For further information, please contact:

Emerald Bay President, Shelby D. Beattie, by telephone at (403) 262-6000
Email: [email protected]
www.ebyinc.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This press release includes statements that may constitute "forward-looking" statements, usually containing the words "believe," "estimate," "project," "expect," "plan," "intend," "anticipates," "projects," "potential," or similar expressions. Forward-looking statements inherently involve risks and uncertainties that could cause actual results to differ materially from the forward-looking statements. Forward-looking statements are statements that are not historical facts.

Information inferred from the interpretation of drilling results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a well is actually developed. BOE's may be misleading, particularly if used in isolation. A BOE conversion ratio of 6 Mcf: 1 Bbl is based on energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead. The reader is cautioned that assumptions used in the preparation of such information, which are considered reasonable by Emerald Bay at the time of preparation, may prove to be incorrect. Actual results achieved will vary from the information provided and the variations may be material. There is no representation by Emerald Bay that actual results achieved will be the same in whole or part as those indicated in the forward-looking statements. Forward-looking statements in this document include statements regarding the Company's exploration, drilling and development plans, the Company's expectations regarding the timing and success of such programs. In particular, forward-looking information in this news release includes, but is not limited to, statements with respect to: pipeline acquisitions and leasing; pipeline permits, pipeline construction, production estimates, drilling operations, completion operations, funding and development goals. Although we believe that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. We cannot guarantee future results, level of activity, performance or achievements. Consequently, there is no representation that the actual results achieved will be the same, in whole or in part, as those set out in the forward-looking information. Factors that could cause or contribute to such differences include, but are not limited to, fluctuations in the prices of oil and gas, uncertainties inherent in estimating quantities of oil and gas reserves and projecting future rates of production and timing of development activities, competition, operating risks, acquisition risks, liquidity and capital requirements, the effects of governmental regulation, adverse changes in the market for the Company's oil and gas production, dependence upon third-party vendors, and other risks detailed in the Company's periodic report filings with the applicable securities regulators.

SOURCE: Emerald Bay Energy Inc.