03:32 PM EST - Golden Touch Resources Corp : announced that drill intersections of up to 5.27 grams/tonne (g/t) platinum (Pt) over three metres and up to 2.06 g/t Pt over four metres have been obtained in the first round of drilling in the Company's Platinum Project (PEL1376) in northeastern Albania. Intervals above 1.0 g/t Pt have been obtained in Holes 1, 2, 3 and 4. Widespread low grade Pt anomalism of up to 0.30 g/t over 15.0 m has also been obtained from all five holes. Five holes were drilled in the first round drilling program for a total of 480.65 m. All of these holes tested the Bregu I Bibes Prospect, down-dip from where channel sampling of trenches excavated in an outcrop, located zones of 1.5 g/t Pt over 14.0 m, 1.9 g/t Pt over 11.0 metres and 2.1 g/t Pt over five metres. Golden Touch Resources Corp
shares V.GOT are trading even at $0.11.