03:52 PM EST - Duluth Metals Limited : announced assay results for 28 holes on the Birch Lake Deposit within the Twin Metals Minnesota Project in northeastern Minnesota. Drilling highlights in the Birch Lake Deposit include: BL11-07-W1 returned a 153.5-foot intersection of 0.767% copper, 0.197% nickel, 3.0 g/t silver and 1.988 grams TPM (TPM = Platinum+Palladium+Gold) at a 0.5% Cu cut-off; BL11-05 returned a 67.5 foot intersection of 0.710% copper, 0.230% nickel, 2.5 g/t silver and 1.817 grams TPM at a 0.5% Cu cut-off.; BL12-09 returned a 101.3 foot intersection of 0.862% copper, 0.273% nickel, 3.0 g/t silver and 1.237 grams TPM at a 0.5% Cu cut-off. Duluth Metals Limited
shares T.DM are trading down $0.02 at $2.40.