09:56 AM EST - Marathon Gold Corporation : announced continued success with latest near-surface drilling results at Valentine East Hill, Valentine Lake Project, Newfoundland. New wide intervals of near-surface gold mineralization including 2.72 g/t Au over 19.0 metres (TT) with 21.93 g/t Au over 1.0 metres (TT) and 9.66 g/t Au over 1.0 metres (TT) in VE-13-025, and 2.01 g/t Au over 21.0 metres (TT) with 16.41 g/t Au over one metre (TT) and 12.55 g/t Au over one metre (TT) in VE-13-024. Additional significant near-surface gold intercepts including 2.59 g/t Au over 3.8 metres (TT) with 7.51 g/t Au over 0.95 metres and 1.61 g/t Au over 6.65 metres (TT) with 7.82 g/t AU over 0.95 metres in VL-13-023. Marathon Gold Corporation
shares T.MOZ are trading unchanged at $0.37.