03:38 PM EST - DualEx Energy International Inc. : announced that production tubing is being installed at the Company's BHN-1 well on the Bouhajla Permit in northeastern Tunisia. Following the evaluation of cased-hole logs the decision was made to configure the wellbore for testing purposes. Several interpreted fracture intervals are observed within a 245 metre thick Abiod section. Elevated C1-C4 gas chromatograph readings along with evidence of micro-fractures observed in drill cuttings coincide with the potential fracture intervals. DualEx Energy International Inc.
shares V.DXE are trading up $0.03 at $0.14.