11:57 AM EST - St Andrew Goldfields Ltd. : announced recent drill results from the Hislop North Project.. H13-003A: 4.43 g/t Au over 20.2 metres (5.25 g/t Au over 20.2 metres uncut) including 12.81 g/t Au over 3.8 metres (16.44 g/t Au over 3.8 metres uncut). H13-013: 8.32 g/t Au over 6.4 metres including 13.42 g/t Au over 2.9 metres. St Andrew Goldfields Ltd.
shares T.SAS are trading unchanged at $0.31.