09:54 AM EST - CB Gold Inc : provided summary drilling results from its Vetas Gold Project, District of Santander, Colombia, located 10 km south of AUX's La Bodega, La Mascota and El Gigante deposits. Results from four holes include seven separate intercepts of 5 g/t AuEq or greater. The Company has received assays from holes 159 to 162 drilled from Platform 29, located 475m east of Platform 21. These are the final holes in the 2013 drilling program and have intercepted wider zones of mineralization in the Tesorito vein and associated hanging wall structures (part of the El Dorado Vein System), including 6.44m at 2.20 g/t Au (RM-DDH13-161) and 10.99m at 1.01 g/t Au (RM-DDH13-160). These results demonstrate the northern and eastern continuity and extension of the El Dorado and San Bartolo Vein Systems, respectively. CB Gold Inc
shares V.CBJ are trading unchanged at $0.27.