09:52 AM EST - Continental Gold Limited : reported the following highlights for the year ending December 31, 2014 for the Buriticá project in Antioquia, Colombia. Last May, the Company announced an updated mineral resource estimate for the Buriticá project, prepared in accordance with NI 43-101. This estimate covers the Yaraguá and Veta Sur vein systems, with a combined measured mineral resource of 0.99 million tonnes of mineralized material containing 0.65 million ounces of gold grading 20.4 g/t gold, 1.54 million ounces of silver grading 48 g/t silver, and 15.0 million pounds of zinc grading 0.7% zinc, and a combined indicated mineral resource of 7.41 million tonnes of mineralized material containing 2.15 million ounces of gold grading 9.0 g/t gold, 6.89 million ounces of silver grading 29 g/t silver, and 75.1 million pounds of zinc grading 0.5% zinc. The combined inferred mineral resource is 16.7 million tonnes of mineralized material containing 4.2 million ounces grading 7.8 g/t gold, 13.1 million ounces of silver grading 24 g/t silver and 111 million pounds of zinc grading 0.3% zinc. Continental Gold Limited
shares T.CNL are trading down $0.04 at $1.97.