11:43 AM EST - Ashburton Ventures Inc. : has encountered a final total of 148 metres of graphite mineralization in its third drill hole (BH15-03) at Buckingham. The drill hole reached its target depth of 224 metres over the weekend, yielding a final total of 148 metres of graphite mineralization across the entire drill hole. The drill hole terminated in mineralization at 224 metres depth. Ashburton Ventures Inc.
shares V.ABR are trading unchanged at $0.02.