10:06 AM EST - Calibre Mining Corp. : Announced additional drill results from its second phase diamond drill program at its 100% owned Golden Eagle Project, USA. New Phase Two drill results from the Golden Eagle program include: 2.98 g/t Au over 87.17 metres in Hole GEC22-002; 2.27 g/t Au over 47.55 metres and 3.70 g/t Au over 48.55 metres and 3.29 g/t Au over 26.82 metres in Hole GEC22-004; 3.36 g/t Au over 37.80 metres in Hole GEC22-005. Calibre Mining Corp.
shares T.CXB are trading up $0.02 at $1.53.