04:00 PM EST - Golden Predator Corp. : announced initial results from its ongoing diamond and reverse circulation drilling programs on its Brewery Creek Project as well as results from its Eureka Project. To date, the Company has drilled six diamond drill holes totaling 1,430 m and 17 RC drill holes totaling 2,350 m on its Brewery Creek Property, located 55 km due east of Dawson City, Yukon. Results for the 6 diamond drill holes and six of the RC drill holes have now been received and analyzed. Significant results from RC holes BCRC10-2315 and BCRC10-2316 are highlighted by intercepts of 4.161 g/t over 7.62 metres starting at 53.43 m depth and 1.428 g/t over 4.57 m starting at 60.96 m depth respectively. Both of these holes targeted the down-dip extension of higher-grade gold remaining south of the Lucky pit. Golden Predator Corp.
shares T.GPD are trading down $0.035 at $0.49.