7/24/2014 - 9:49 AM EST - Gold Mountain Mining Corporation : resumed the open pit bulk sample test on its 100% owned Elk Gold property, located near Merritt, British Columbia The bulk sample mining began on June 19 with the aid of two hydraulic excavators and three 30-tonne articulated haul trucks and will continue until the bulk sample program is completed. In excess of 3,000 tonnes of mineralized material has already been mined and is being trucked on a 24-hour basis to the contract processing facility. The average grade of the 3,000 tonnes of mined material is approximately 19.1 grams of gold per tonne, representing 1840 ounces of gold with an attributed gross value of approximately $2.4 million U.S. at $1,300/oz U.S. Gold Mountain Mining Corporation
shares V.GUM are trading unchanged at $0.18.