6/30/2015 - 11:34 AM EST - Northern Gold Mining Inc. : announced updated results from the bulk sampling program at its Garrcon deposit, part of the Company's Golden Bear Project. All results are as of June 24, 2015. Batch 8: Processed 14,723 dry tonnes grading 1.375 g/t, recovering 631.1 oz Au at 97% recovery. Total to date: Processed 55,348 dry tonnes of mineralized material at an average head grade of 1.59 g/t (69% of the total bulk sample program of 80,000 tonnes) in eight batches by St Andrew Goldfields Ltd. at its Holt Mill. The first batch was processed September 13, 2014, with the most recent complete batch ending May 9th, 2015. Northern Gold Mining Inc.
shares V.NGM are trading unchanged at $0.02.